B
BOOTY MONSTER
Guest
thanks homer . i still have to cut the excess bolts off and do some filing here and there . but it's coming along .
i put on the 4th basket element and put on the gamma to show how it looks together .
the tape on the gamma strap is just to hold the rod about 5 3/8 inches out from the center vertical to show about where it will go . the strap needs to be cut to length , but ill do that after the whole basket and lower 9 ft section is together so i can see how it's positioned with the basket elements .
that's all for today . its hot !! im gonna cool down , get cleaned up and go out for the night . ill finish it monday , supposed to be cooler .
i put on the 4th basket element and put on the gamma to show how it looks together .
![IMG_0123.jpg](/proxy.php?image=http%3A%2F%2Fi867.photobucket.com%2Falbums%2Fab234%2FBOOTY-MONSTER%2FIMG_0123.jpg&hash=d860a4529b502e07808a6513921ac907)
![IMG_0121.jpg](/proxy.php?image=http%3A%2F%2Fi867.photobucket.com%2Falbums%2Fab234%2FBOOTY-MONSTER%2FIMG_0121.jpg&hash=aa1c20d5b5bfc7abdf921587840a24f5)
![IMG_0122.jpg](/proxy.php?image=http%3A%2F%2Fi867.photobucket.com%2Falbums%2Fab234%2FBOOTY-MONSTER%2FIMG_0122.jpg&hash=72f20ccdd9ba6a1dec7013b5aea80429)
the tape on the gamma strap is just to hold the rod about 5 3/8 inches out from the center vertical to show about where it will go . the strap needs to be cut to length , but ill do that after the whole basket and lower 9 ft section is together so i can see how it's positioned with the basket elements .
that's all for today . its hot !! im gonna cool down , get cleaned up and go out for the night . ill finish it monday , supposed to be cooler .